The UAE announces control of the oil tanker GEM NO .2 leak

An-Nahar: The UAE Ministry of Energy and Infrastructure explained that specialized technical teams continue their technical response work on the tanker, which included repairing the damaged parts, restoring some operational systems, in addition to assessing the integrity of its structure to determine the most suitable options for dealing with it in a…
Machine translation of an attributed source excerpt. Consult the original report to verify details. Translated from original reporting in another language.

