Qlayaat Airport enters the implementation phase
According to IMLebanon, the Ministry of Public Works and Transport and the General Directorate of Civil Aviation have announced the commencement of technical calibration and operational testing of the air navigation and visual aids systems at the Qlaya Airport (President Rene Mouawad Airport). These procedures include a detailed check of the effectiveness of the Precision Approach Path Indicator (PAPI) system, approaches and landings, and air traffic management in the surrounding airspace. The ministry and the authority stated that the rehabilitation and reactivation project of Qlaya Airport has transitioned from the planning phase to actual implementation and comprehensive engineering on the ground, within a well-planned timeline that ensures the sustainability of the air navigation infrastructure. Both entities emphasized that this vital and strategic facility is subject to international civil aviation organization regulations, particularly Annex 14, which pertains to airport design and operation. They also highlighted that aviation safety and security are a top priority, non-negotiable, and will not be compromised in any way. Ad-Diyar reported that the same operations have begun, aligning with the information provided by the other outlet.
Written by LebaneseInsider with AI assistance from the reports below, each claim attributed to its outlet. Read the original reports for full details.
Reporting timeline
2 outletsReports grouped around the same specific event, ordered by original publication time. Source headlines below retain their original language. Coverage count is not independent confirmation.


