lebaneseinsider
Filters
العربية
Society

Electricité du Liban: A fault in the telephone exchanges supplying the temporary control center at the Jamhour station led to the general outage

WhatsApp ↗اقرأ بالعربية
Electricité du Liban: A fault in the telephone exchanges supplying the temporary control center at the Jamhour station led to the general outage
Via LBCI
WHAT TO KNOWFrom National News Agency

National News Agency – Électricité du Liban explained in a statement that “the general power outage that occurred yesterday, on 28/10/2026, and which led to a loss of electricity at Rafic Hariri International Airport, was caused by a fault in the communications systems at the telephone exchanges that provide service to the temporary center…”

Machine translation of an attributed source excerpt. Consult the original report to verify details. Translated from original reporting in another language.

Photos from the coverage

Reporting timeline

5 outlets

Reports grouped around the same specific event, ordered by original publication time. Source headlines below retain their original language. Coverage count is not independent confirmation.

  1. LBCIكهرباء لبنان: عطل في سنترالات الهاتف المغذية لمركز التحكم الموقت في محطة الجمهور أدى إلى الانقطاع العام ↗
  2. National News Agencyكهرباء لبنان: عطل في سنترالات الهاتف المغذية لمركز التحكم الموقت في محطة الجمهور أدى إلى الانقطاع العام ↗
  3. Elnashraكهرباء لبنان: عطل في سنترالات الهاتف المغذية لمركز التحكم الموقت في محطة الجمهور أدى إلى الانقطاع العام ↗
  4. Saida Onlineكهرباء لبنان: عطل في سنترالات الهاتف المغذية لمركز التحكم الموقت في محطة الجمهور أدى إلى الانقطاع العام ↗
  5. El Maradaكهرباء لبنان: عطل في سنترالات الهاتف المغذية لمركز التحكم الموقت في محطة الجمهور أدى إلى الانقطاع العام - elmarada ↗

Related coverage

YOUR NEWS, YOUR PACE

Stay in the picture.

Choose the updates that matter to you. No account needed.